Fabrication design and project management of a new dairy industry in Argos Pelloponisos, with a production area of 526m2, utilities area of 75m2, loading docks of 240m2 and office area of 83m2.
The production area is made of reinforced concrete and structural steel and the office of reinforced concrete.